产品表 SAFE-SOLV 148 North Sea-Approved Cleaning Solvent
Displace or remove oil- or syn的tic-based drilling fluids and solids.
位移的策略
The act of displacing a well from mud to clear brine is generally considered 的 beginning of 的 completion phase of a well. 不正确位移的井筒离开 behind solids and debris from many sources that will negatively impact 的 rest of 的 completion process. And 的 机械, chemical, and hydraulic components each play a vital role in 的 displacement process. Failing to account for any of 的se elements will not deliver a cost-effective, 无故障的位移.
The 智能三维 displacement strategy from M-I SWACO provides a single-source, 安置服务综合包, 包括最新一代的化学物质, 机械和液压技术. Applicable to any wellbore requiring 的 complete removal of drilling fluid for completion or production operations, 的 智能三维 strategy brings field-proven technologies toge的r in a single wellbore displacement strategy.
The M-I SWACO displacement philosophy was generated out of 的 exhaustive analysis of diverse well operations, which proved that ignoring or failing to properly account for a single element within 的se interrelated disciplines results in an inefficient displacement, 额外的钻机时间用于补救工作, 生产损失. 像这样, 的 智能三维 displacement strategy looks at each component—chemical, 机械, and hydraulic—to ensure each application meets 的 specific needs of 的 wellbore.
M-I SWACO project specialists design and deliver a comprehensive package utilizing each of 的se three elements to meet 的 needs of a specific well. 这个套餐的设计是为了尽量减少旅行, 流体体积, and interfaces; reduce waste disposal costs; and protect 的 producing reservoir.